Callaway

Basic Facts:

  • Location: Auxvasse Township, Missouri
  • Owner: Ameren Missouri
  • Operator: Ameren Missouri
  • Construction Cost: $7.2B (2018$)
  • Plant Output: 1,200 MW
  • Property Size: 7,200 acres
  • Status: Operational
  • Employees: 800
  • Expected Shut Down Date: 2044
  • Current DTF Balance: $470M (2018$)
  • DTF Balance Prior to Decommissioning: $2.0B (2018$)
  • Decommissioning Cost Estimate: $520M (2018$)
  • Spent Nuclear Fuel on Site: 813 metric tons
oyster creek

Background

The Callaway nuclear power station consists of a single four-loop pressurized water reactor. Construction began in 1975 with licensed operations commencing in 1984.

In 2015, the Nuclear Regulatory Commission granted Callaway a twenty-year license renewal, extending its licensed operational life to 2044.

Socioeconomics

The Callaway nuclear power plant is located within Callaway County, Missouri. As of 2016, socioeconomic information is as follows:

  • Population: 45,000
  • Per Capita Annual Income: $35,000
  • Unemployment rate (not seasonally adjusted): 3.3%

The Callaway Nuclear Facility’s annual payroll is approximately $100M. The plant’s annual state and local tax payments are approximately $10M.

Contact Information

Economic Development Administration Representative:

Economic Development District

Nuclear Regulatory Commission

Unless specific costing information has been provided, decommissioning costs were derived from 2017 Decommissioning Funding Status Report.
Information herein obtained from public sources. Corrections are welcome and may be directed to [email protected].

(802) 345-7044

Connect

Blog

Contact

Download our

free report

Discover tools and information for improving project outcomes and
catalyzing economic recovery

Scroll to Top