NRC and Holtec to face off publicly over redesign of spent fuel canisters at San Onofre plant

NRC and Holtec to face off publicly over redesign of spent fuel canisters at San Onofre plant

As Southern California Edison gears up to resume loading spent nuclear fuel into its “concrete monolith” at San Onofre, the Nuclear Regulatory Commission is expected to publicly spank contractor Holtec International for failures related to a redesign of the waste canisters – a redesign that caught the NRC, and Edison, by surprise.

(802) 345-7044

Connect

Blog

Contact

Download our

free report

Discover tools and information for improving project outcomes and
catalyzing economic recovery

Scroll to Top