Dresden 2 & 3

Basic Facts:

  • Location: Morris, Illinois
  • Owner: Exelon Corporation
  • Operator: Exelon Generation
  • Construction Cost: $1.9BM (2018$)
  • Plant Output: 1,800 MW
  • Employees: 800
  • Property Size: 950 acres
  • Status: At Risk of Closure
  • Expected Shut Down Date: Unit 2 (2029), Unit 3 (2031)
  • Current DTF Balance: $1.4B (2018$)
  • DTF Balance Prior to Decommissioning: $1.8B (2018$)
  • Decommissioning Cost Estimate: $1.3B (2018$)
  • Spent Fuel on Site: 1,449 metric tons
Dresden 2 & 3 Photo

Background

Dresden 2 and 3 are boiling water reactors producing a combined output of 1,800 MW of electricity. These two units are the operational component of the three-unit Dresden Generating Station. Construction of Units 2 and 3 began in 1966 and operating licenses were granted by the NRC in 1970 and 1971 respectively. In 2004, the NRC granted operating license renewals for both units extending their operating life to 2029 (Unit 2) and 2031 (Unit 3).

Socioeconomics

Dresden 2 & 3 are located in Grundy County, Illinois. As of 2016:

  • Population: 50,000
  • Per Capita Annual Income: $48,000
  • Unemployment rate (not seasonally adjusted): 5.9%

The annual payroll at the Dresden Generating Station is approximately $80M and in 2017 the plant contributed $25M in property tax payments.

Contact Information

Economic Development Administration Representative:

Nuclear Regulatory Commission

Unless specific costing information has been provided, decommissioning costs were derived from 2017 Decommissioning Funding Status Report.
Information herein obtained from public sources. Corrections are welcome and may be directed to [email protected].

Additional Information

Channahon Village Board supports local nuclear power plants

March 15, 2020

Channahon Village Board supports local nuclear power plantsArea nuclear power plants are facing the possibility of closing. According to some local proponents of the Dresden, Braidwood and LaSalle stations, the public needs to jump into the fight to keep them open.

Read More

Ready or not, Springfield preps for an energy-industry rumble

January 28, 2020

Ready or not, Springfield preps for an energy-industry rumble For decades, major energy initiatives in Illinois have run through two gatekeepers-House Speaker Michael Madigan and Commonwealth Edison. Springfield is preparing to test whether it can fundamentally alter the state’s energy future with those two political powerhouses sidelined. “We have a lot of work to do-and […]

Read More

Community Leaders Forming Coalition to Keep Dresden Nuclear Station Open & Viable For The Future

January 22, 2020

Community Leaders Forming Coalition to Keep Dresden Nuclear Station Open & Viable For The Future Our sister station WCSJ reports that Grundy County and Exelon officials are working together to keep Dresden Nuclear Station open in the future. The plant, near Morris, serves the northern portion of the state. Nancy Norton with the Grundy Economic […]

Read More

Legal cloud or no, CEO says Exelon will close nukes without spring bailout

November 4, 2019
Read More

Illinois lawmakers move ahead with bill to benefit nuclear power plants

March 27, 2019
Read More

Exelon threatens closure of three more Illinois nukes

February 13, 2019
Read More

(802) 345-7044

Connect

Blog

Contact

Download our

free report

Discover tools and information for improving project outcomes and
catalyzing economic recovery

Scroll to Top